This week, work is continuing on the Magic Kingdom Ferry Boat upgrades to enable second-level access from the dock to the boat.
Pilings are being installed at the TTC dock, ultimately supporting the new gangway and stairs leading up to the second deck.
All of the pilings are complete at the Magic Kingdom dock, and the area where the gangway will meet the walkway to the Magic Kingdom is prepared.
On the Richard F. Irvine, the front and rear sections on the second level are walled off, and railings have been removed in preparation for the new access points.
When complete, the second level access will allow faster unloading of the ferry boat with guests being able to leave directly from the second level without using the exit on the first level.
Get Walt Disney World News Delivered to Your Inbox